Heiligenfeld, Germany

    10.2 MWp Ground Mount Solar Project in Heiligenfeld, Germany

    10.2 MWp ground mount solar installation in Heiligenfeld, Germany
    Capacity
    10.2 MWp
    System type
    Ground Mount
    Location
    Heiligenfeld, Germany
    Build period
    Jan 2024 - Mar 2024

    Project overview

    This 10.2 MWp ground mount photovoltaic system was delivered in Heiligenfeld, Germany, with construction during Jan 2024 - Mar 2024. The scope covered engineering, procurement and construction — layout and yield design, structural and electrical engineering, module and inverter supply, mounting, DC and AC installation, grid connection works, testing and commissioning.

    As a ground-mount plant, the works included site preparation, pile-driven mounting structures, internal cable routing, inverter and transformer stations, medium-voltage connection, fencing and security infrastructure. Row spacing and tilt were optimised for the local irradiation profile and terrain.

    Scope of works

    • Site survey and feasibility assessment
    • Layout, yield modelling and electrical design
    • Module, inverter and mounting procurement
    • Mechanical installation and DC/AC works
    • Grid connection coordination and protection settings
    • Testing, commissioning and handover documentation